Teamwork the big film project
1. Be able to contribute to the setting of the team and individual goals
We sat together as a team and decided who will be doing what role, who's idea we well be going with.
2. Understand own and others' responsiblities in achieving the team goals
2.1 organise own activities effectively within the agreed goals of the team ...
As I am going to ........
I need to prepare my work over the next few weeks....
Wednesday 25th april
Decide on prodution dates
Friday 27th april
Team prodution meeting
Wednesday 1st May
Team produtions meeting
Milestone deadline cast confirmed
Friday 3rd may
Milestone deadline screenplay written
storybored complete
Location scouted
costume secured
heath and safety complete
Wednesday 8th may
In production
Friday 10th may
In production
Friday 10th may
Editing
Friday 10th may
Completed
2.2 provide information detailing own and other team mates responsibilities
NAME ROLE Responsibility
SAM Cinematographer/Director of Photography Source location
Health and Safety considerations
Ensure all footage is named correctly and
upload to a designated area to enable the
editors to edit the final piece
Karim Editor/Sound Sound during the productions
Check mic level
Booking equipment and returning it
(In post-production) liase with Matt and Deacon
Discussing the vision for the final film.
Layton Camera Production Acting
Source location
Health and Safety considerations
Ensure all footage is named correctly and
upload to a designated area to enable the
editors to edit the final piece
Matthew Director Rehearsing with actors prior to the shoot
Holding a read through
Both directors liase with camera operators
Be available to approve locations
Be available to discuss with Ofenste and for props
Deacon Assistant Director Rehearsing with actors prior to the shoot
Holding a read through
Both directors liase with camera operators
Be available to approve locations
Be available to discuss with Ofenste and for props
James Assistant Camera Source location
Health and Safety considerations
Ensure all footage is named correctly and
upload to a designated area to enable the
editors to edit the final piece
Ofentse Make up and Costume Over seeing the company to ensure they are able to gather the costumes correctly
Practice before production - take photographs for continuity purposes.
Jaime Screenplay Working with James to develop and create the
screenplay from his original storyline
Work alongside Directors Matt and Deacon
Dan Editor (in post - productions) liase with Matt and
Discussing the vision for the final film.
Josh Technical Assistant Ensure equipment is booked and or sourced
Batteries are charged
Props
3 BE able to plan and undertake team activities
3.1 plan activities that enable the team to reach its goal
3.2 identify own responsibility towards the team in relation to the plan
3.3 carry out responsibilities
3.4 contribute to the successful completion of team activities
4BE ABLE TO REVIEW THE TEAM ACTIVITIES
4.1 feedback on own actions in relation to the overall team activities
During the movie my role was to shoot the film. The problem I had it was to windy and my hands a were shaky. This is my first time doing ever and I think I an alright job. Also, I was working with people i've never worked before. This was a problem for some of the crew and cast and some people decided to have a major arguments., I think the shot locations were good however the shoots were filmed different days were the cast had different outfits and different weather.
Disappointing start one of the team was missing today therefore we didn't have a script
Actors arrived so we we had to think on our feet to make the afternoon productive
Then we the actors improvised and we made a scene
Overall I believe film did not go to plan.This is to result to lack of preparation and teamwork. One of members of the team did not turn up for weeks, his role was the screenwriter. So we had to make a new script which also didn't go to plan as result to lack of planning. During the filming process that also didn't go to plan, this is result to people arguing and lack of confidence from the directors, resulting in Matthew storming off.
Also, the editing was poor and disappointing. The sound would go from insanely loud to non existent.
Also, the ending has the meme song ( Epic Sax Guy) that wasn't decided on and ruins the tone of the movie and ruins the end in my opinion.
I carried responsibilities to the best to my ability. My roles were to be the cinematographer, I chose the shots and I filmed the movie with the help of my assistant Karim Katouche.
What the team did successfully was to get a 2nd script done, get actors and overall finish the movie .
I think I did alright, but I could of made some better shots and get some with better sound.